The Building of Spraymaker
Labels
Base is prepared
(1)
Bog Winsurfer
(1)
Building site cleared
(1)
Inside welds and home made mask Dave in Picture
(1)
Laying the keel
(1)
metal boat
(1)
plasma cutter
(1)
Portholes
(1)
ready for final preperation for painting
(1)
steel cutting
(1)
Tha last section of Hull Welding
(1)
Workshop
(1)
Sunday 1 November 2009
The Second Bulkhead
With a combination of chains, tackles, and with the help of the forklift the second bulkhead is positioned. The boat will have a central cockpit so these two bulkheads are a key part in the construction.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment