The Building of Spraymaker
Labels
Base is prepared
(1)
Bog Winsurfer
(1)
Building site cleared
(1)
Inside welds and home made mask Dave in Picture
(1)
Laying the keel
(1)
metal boat
(1)
plasma cutter
(1)
Portholes
(1)
ready for final preperation for painting
(1)
steel cutting
(1)
Tha last section of Hull Welding
(1)
Workshop
(1)
Sunday 1 November 2009
Securing the Bulkheads
Once in position the bulkheads are strenghened by welding virtical strips of iron bar.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment