The Building of Spraymaker
Labels
Base is prepared
(1)
Bog Winsurfer
(1)
Building site cleared
(1)
Inside welds and home made mask Dave in Picture
(1)
Laying the keel
(1)
metal boat
(1)
plasma cutter
(1)
Portholes
(1)
ready for final preperation for painting
(1)
steel cutting
(1)
Tha last section of Hull Welding
(1)
Workshop
(1)
Sunday 1 November 2009
The 1st Bulkhead
Putting in the 1st bulkheads was quite a challenge, they weighed close to a ton each
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment