The Building of Spraymaker
Labels
Base is prepared
(1)
Bog Winsurfer
(1)
Building site cleared
(1)
Inside welds and home made mask Dave in Picture
(1)
Laying the keel
(1)
metal boat
(1)
plasma cutter
(1)
Portholes
(1)
ready for final preperation for painting
(1)
steel cutting
(1)
Tha last section of Hull Welding
(1)
Workshop
(1)
Sunday 1 November 2009
With a good sized workshop adjacent to the build site I was already to proceed with the build
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment