The Building of Spraymaker
Labels
Base is prepared
(1)
Bog Winsurfer
(1)
Building site cleared
(1)
Inside welds and home made mask Dave in Picture
(1)
Laying the keel
(1)
metal boat
(1)
plasma cutter
(1)
Portholes
(1)
ready for final preperation for painting
(1)
steel cutting
(1)
Tha last section of Hull Welding
(1)
Workshop
(1)
Sunday 1 November 2009
The keel was the first part of the boat to be constructed, If I had read the instructions more carefully i would have realised their was a simpler way to do this but it worked out well enough the way I did it.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment